Quillayute River sea dike
Photo from 2013 shows a breach in the Quillayute River sea dike. Infrastructure Investment and Jobs Act funds $5.54 million project to restore the sea dike by replacing missing rock to return it to design dimensions. The neighboring navigation channel is extremely dangerous in certain sea conditions; exacerbated by the sea waves washing over the damaged dike. Repairing the sea dike to the authorized design would reduce waves from sweeping across the channel and provide safer navigation to the US Coast Guard, Quileute Tribe, and the public.

Download Image: Full Size (1.89 MB)
Tags: IIJA
Photo by: U.S. Army Corps of Engineers |  VIRIN: 130626-A-YV091-1001.JPG