Perimeter Wall Construction Project At Wyckoff/Eagle Harbor Begins April 18
Photo of sheet pile wall facing Puget Sound and Seattle during low tide. The beach in front of the sheet pile wall is a sand cap that protects the Puget Sound from creosote contamination. The sheet pile wall is scheduled to be replaced by September 2026.