Please review the sample drawing for typical projects requiring a permit from the U.S. Army Corps of Engineers. These sample drawings are for reference only. These drawings must not be reproduced or submitted with an application. Drawings are in pdf format.
Please use this drawing checklist to ensure that your drawing contains all the information we need for your project.
Please submit electronic versions of permit application materials, such as the JARPA, Biological Assessment/Evaluation, Wetland Delineation, Mitigation Plan, and drawings to NWS-PermitApp@usace.army.mil. This will facilitate our permit review process. Click here for detailed instructions for electronic submittals.