Results:
Tag: Seattle District
Clear
  • Work to begin on the Hiram M. Chittenden Locks scour repair project

    Seattle District, U.S. Army Corps of Engineers’ officials have announced work will begin on the Emergency Scour Repair Project September 15.
  • Seattle District deploys local employees for Hurricane Laura recovery

    The U.S. Army Corps of Engineers, Seattle District, deployed local technical experts to Louisiana Aug. 29 to support Hurricane Laura recovery efforts. A five-person Infrastructure Assessment Planning and Response Team deployed to assist the state with damage assessments of water and wastewater treatment facilities. They are also evaluating critical public infrastructure to determine if emergency repairs are necessary.
  • Army Corps of Engineers repairing Koch Slough Fishway near Silvana

    Efforts to improve fish passage at the Koch Slough in Snohomish County starts today as Seattle District, U.S. Army Corps of Engineers’ officials begin repairing the fishway on the Stillaguamish River near Silvana, Washington.
  • Port of Tacoma receives approval for first environmental mitigation bank

    SEATTLE - The Upper Clear Creek Mitigation Bank is the Port of Tacoma's first mitigation bank and only the second joint wetland and fish conservation bank in Washington. The Port of Tacoma’s Upper Clear Creek Mitigation Bank, designed to offset adverse impacts to salmon and wetland habitat from development, received final approval on June 24 from the state Department of Ecology (Ecology), U.S. Army Corps of Engineers (Corps), and National Oceanic and Atmospheric Administration’s National Marine Fisheries Service (NMFS).
  • Colonel Bullock Assumes Command of Seattle District, U.S. Army Corps of Engineers

    Colonel Alexander “Xander” L. Bullock assumed command of the Seattle District, U.S. Army Corps of Engineers Tuesday. He joins the district after serving in the U.S. Central Command (CENTCOM), Tampa, Florida, as a part of the Commander’s Action Group and in the J4 (logistics) as a logistics plans officer.
  • Army Corps opening Libby Dam Campgrounds

    U.S. Army Corps of Engineers (USACE) officials at Libby Dam will open Blackwell Flats and Dunn Creek Flats Campgrounds Friday afternoon, May 22, 2020, in time for Memorial Day weekend. While the campgrounds, boat ramps and day-use areas are open, the Libby Dam Visitor Center and Dam Tours will remain closed until further notice. Special Events have been cancelled or rescheduled for the fall. Picnic Shelters also remain closed, with no reservations available for now. Individual picnic tables are still available.
  • Seattle-based U.S. Army Corps of Engineers team to evaluate facilities as alternate-care-sites in Washington

    A Seattle District, U.S. Army Corps of Engineers (USACE) assessment team will begin evaluating existing facilities for possible conversion into alternate-care-sites in Washington March 26.
  • Army Corps repairing three Whatcom County levees

    The U.S. Army Corps of Engineers, Seattle District, will repair three levees in Whatcom County, Washington, beginning June 17.
  • Chittenden Locks to close 8 hours May 29

    The large and small locks will close to all marine traffic eight hours, 8 a.m. to 4 p.m., May 29 to inspect and close a saltwater drain screen structure.
  • Chittenden Locks small chamber closing 2 weeks for annual maintenance

    SEATTLE – The Hiram M. Chittenden Locks small chamber will close to marine traffic noon, March 5 through 5 p.m., March 16. Crews will conduct maintenance and safety inspections during the small chamber closure. Foot traffic will not be affected and the large lock will continue around-the-clock operations for vessels. Lock wall staff will get commercial traffic through as quickly as possible.